News
HOME  >  News

WF Pin Cyclone Pulse Pulverizer Machine Installation and Debugging

Dec. 26, 2023
Share

1. Unloading the bearing: first open the chamber, unload the rotary pan or knife, take out the maze and the center bearing caps; and then unload belt and outer bearing caps; finally separately pull and unload bearing and shaft form both sides.

2. When install the shaft cavity liner, the oil hole should aim at oil eye.

3. When install the screen, the screen ring should attach to the inner of the chamber shoulder, or the ring will be broken when the door closes.

4. The detailed size of the screen should be according to the specification of the inner screen shoulder. Ask manufacturer to make the screen when the screen is broken.


WF Pin Cyclone Pulse Pulverizer Machine Installation and Debugging


Back to List
Contact Us
  • WhatsApp: 8613921209007
  • Mob. : +86 139 2120 9007
  • E-mail: [email protected]
  • Fax : +86 510 8600 3712
  • WeChat : wjt6363
  • Add : 214411 No. 3 Xiyuan Road, Innovation Park, Changjing Town,Jiangyin, Jiangsu Province, China